Power, cooling and electrical equipment

The Index · October 2026 editionThe switchgear, transformers and cooling a data centre needs, and the contractors who fit them.
How to cite

Cognitive Coefficient Institute (2026). The Cognitive Coefficient Index, October 2026 edition: Power, cooling and electrical equipment. https://alpha.cognitivecoefficient.com/index/editions/2026-10/electrical. Licensed CC BY 4.0.

#NameSegmentSCX · Stack Capacity IndexAIX · AI exposure
01Schneider ElectricPower distribution & UPS83.750.0
02VertivPower distribution & UPS74.980.0
03Comfort Systems USAElectrical contractors & EPC58.755.0
04EMCORElectrical contractors & EPC56.525.0
05Wesco InternationalElectrical distribution55.522.0
06Siemens (Smart Infrastructure)Power distribution & UPS54.715.0
07LegrandPower distribution & UPS52.550.0
08ABBPower distribution & UPS50.928.0
09Hitachi (Hitachi Energy)Transformers & grid equipment46.718.0
10CaterpillarBackup generation46.315.0
Stack Capacity Index: components and weights in this edition
  • Revenue17%
  • Data-centre revenue33%
  • AI exposure (estimate)20%
  • Position (estimate)20%
  • Momentum (estimate)10%

Licensed CC BY 4.0: reuse freely, credit “Cognitive Coefficient Institute”. Scores are model outputs, not predictions. Terms.